Ski Resorts News
02/10/2023
The "Cote du Bois" 10 seats gondola will provide easy access to the intermediate altitude zone of the La Toussuire resort and promote the ascent to Ouillon, the connection to Le Corbier and a return to the snow front of the resort.

With a length of 859m for a vertical drop of 232m, it will have a throughput of 2,700 skiers per hour.
This first section of 8,5 M€ investment will be extended later for direct access to the Sybelles high-altitude ski area. A second cable car is planned as an extension of the current cable car for 2025 to make this connection.
Cote du Bois technical specifications:
Number of stations: 2
Number of supports: 8
Number of cabins: 38
Length: 863 m
Altitude difference: 203 m
Height of valley station: 1710 m
Height of mountain station: 1943 m
Capacity: 2700 people/h
Speed: 5.5m/s
Ascent time: 3.11 minutes
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026